Projects
Recent Projects


Residential and Commercial Property
MODA Great Charles Street
John SISK’s “Moda Great Charles Street” – Birmingham
This landmark £300M project involved full-time QA/QC management, supervision, and inspection to ensure quality and safety across all groundwork activities. Responsibilities included mentoring junior engineers, reviewing technical designs to address potential issues, and ensuring compliance with health and safety regulations. The role extended to managing finishing and handover procedures, supervising temporary works, and inspecting drainage installations for proper functionality and adherence to specifications. This transformative project in Birmingham reflects our ability to manage large-scale, high-value residential developments with precision and expertise.
- Conducted QA/QC management and inspections
- Supervised drainage installations and temporary works
- Managed finishing, handovers, and safety compliance
Residential Property
The Crown Works
GRAHAM’s “The Crown Works” – Birmingham
This £40M multi-story residential project involved full-time supervision of critical construction phases, including the entire groundwork and a portion of the RC frame construction. The role focused on ensuring quality compliance, overseeing safety measures, and maintaining adherence to project specifications. This supervision contributed to the successful execution of foundational and structural elements of the project.
- Supervised groundwork and partial RC frame
- Ensured compliance with safety and quality
- Delivered foundational and structural phase oversight




Industrial Unit
Industrial Concrete Flooring
Glencar’s Industrial Warehouse – Jaguar Land Rover, Solihull
This project involved overseeing the quality assurance and control (QA/QC) of a critical £1 million Fibre Reinforced Concrete (FRC) slab. Designed to meet exceptionally high specifications, the slab required meticulous attention to detail and almost zero tolerance for deviations. Tasks included verifying material quality, monitoring precise placement techniques, and ensuring the surface achieved optimal strength and durability. This role was essential in delivering a high-performance flooring solution capable of meeting the rigorous demands of an industrial environment.
- Ensured quality of £1M FRC slab
- Oversaw precision placement and material standards.
- Delivered high-spec, zero-tolerance flooring