TR34 floor flatness surveys: how floors are measured, and when they fail

What a TR34 survey measures in free-movement areas and very narrow aisles, how the 95th percentile and defined-movement limits work, and what a survey report should give you.

AA Dr Arasti AfrasiabiNovember 202610 min read
Steel portal frame and a finished power-floated slab inside a new warehouse unit

A warehouse floor can be strong, crack-free and well finished and still be the wrong floor. If it is not flat and level enough for the trucks that run on it, reach trucks lean at height, very narrow aisle (VNA) trucks have to slow down, and the clearances the racking was designed around start to disappear. In the UK the reference for how flat is flat enough is The Concrete Society's TR34, Concrete Industrial Ground Floors, 4th edition. Its surface regularity section, revised in this edition to reflect the European Standard EN 15620, sets out what a survey measures, how the results are analysed and when a floor fails. This article walks through it.

Flatness and levelness are not the same thing

TR34 treats them separately. Flatness describes variation over short distances, traditionally controlled over 600 mm. Levelness describes variation over longer distances, traditionally 3 m. A floor can be flat but not level: smooth underfoot, yet falling steadily across a bay. It can also be level but not flat, with the right heights at the grid points but undulations a truck wheel will feel in between. A survey has to control both. The methods also assume the floor is meant to be horizontal, not laid to falls.

The first question: free movement or defined movement?

Every TR34 survey starts with how the trucks will use the floor, because the two cases are specified and surveyed in completely different ways.

A defined-movement specification only makes sense when the aisle positions are known when the floor is built. If they are not, TR34 says it is not appropriate to specify the aisles as defined movement. Areas outside the aisles, such as goods in, goods out and transfer areas, remain free-movement areas.

Free-movement surveys: Properties E and F

No survey can measure every point on a floor, so TR34 samples it in two ways.

Worked example of Property F: three readings 300 mm apart give level differences of minus 0.2 mm and plus 0.6 mm, so Property F is 0.8 mm 0.0−0.2+0.4 −0.2 mm+0.6 mm 300 mm300 mm Property F = (+0.6) − (−0.2) = 0.8 mm
Three consecutive readings 300 mm apart (levels in mm, exaggerated vertically). The two level differences are −0.2 mm and +0.6 mm; Property F is the change between them, 0.8 mm.

On a 10,000 m² floor that means Property F runs totalling at least 1,000 m, over 3,000 individual readings at 300 mm spacing, plus a level at every point of the 3 m grid. The grid and the run positions must be recorded accurately so that the same points can be revisited later.

How a free-movement floor passes or fails

The results are judged statistically. For each property, the 95th percentile value is calculated: the value below which 95% of the readings fall. TR34 Table 3.1 sets the upper limits.

CLASSTYPICAL USE (TR34)E (mm)F (mm)
FM1Very high standards of flatness and levelness. Reach trucks above 13 m without side-shift.4.51.8
FM2Reach trucks at 8–13 m without side-shift.6.52.0
FM3Retail floors to take directly applied flooring. Reach trucks up to 8 m without side-shift, or up to 13 m with it.8.02.2
FM4Retail floors to take applied screeds. Workshops and manufacturing with lift heights restricted to 4 m.10.02.4

Permissible 95th percentile values, from TR34 4th edition, Table 3.1. Side-shift is the truck's ability to move the pallet sideways across the fork direction.

The floor is non-compliant if either 95th percentile limit is exceeded, or if any point on the Property E grid lies outside ±15 mm of a fixed datum. Where no original datum exists, the check is ±15 mm of the mean floor level.

Because the limits are percentiles, a compliant FM floor can contain individual readings above the limit; up to 5% of them can be. That is deliberate, because it judges the floor as a whole rather than on one bad reading. The ±15 mm datum check is the exception: it applies to every grid point.

Defined-movement surveys: every reading counts

In a VNA aisle the truck runs in the same tracks every time, so TR34 controls the floor along those tracks, using the truck's own geometry.

Aisles are surveyed over their full length along the wheel tracks, starting with the load axle at the first rack upright. The instrument is a profileograph, a specialist digital device taking readings at intervals of no more than 50 mm; d²Z and d²X are computed from the dZ and dX data. Unlike free movement, there is no percentile. The floor is non-compliant if any measurement in any aisle exceeds any limit.

CLASSRACKING TOP BEAMdZd²ZdXd²X
DM1Over 13 mZ × 1.3Z × 1.02.91.5
DM28–13 mZ × 2.0Z × 1.54.42.0
DM3Up to 8 mZ × 2.5Z × 1.95.52.5

Permissible limits in mm, with Z in metres, from TR34 4th edition, Table 3.2.

The limits all follow from one figure, the permitted cross-aisle slope (ZSLOPE): 1.3, 2.0 and 2.5 mm per metre for DM1, DM2 and DM3. dZ is Z × ZSLOPE, d²Z is three-quarters of dZ, and dX is 2 × ZSLOPE × 1.1, which reflects the fixed 2 m wheelbase.

The reason for this strictness is the mast. TR34 explains that a level difference between the wheel tracks is magnified at the top of the mast in direct proportion to its height. Level variations also set up dynamic movement that can significantly magnify that static lean. Take a truck with front wheels 1.5 m apart on a DM2 floor. dZ can be up to 1.5 × 2.0 = 3.0 mm. With the mast raised to 12 m, that 3 mm becomes 3.0 × 12 ÷ 1.5 = 24 mm of static lean at the top, before any sway.

A free-movement floor is judged on its 95th percentile. A VNA aisle fails on a single reading.

Choosing the class

When to survey, and why timing matters

TR34 recommends surveying within one month of completing the whole floor, or a major section of it, to check that the floor complies as built. Surveys during construction are also valid as a quality control check that the finished floor will meet the specification.

Timing matters because floors move. TR34 lists deflection of suspended slabs and settlement of the ground, piles or other supporting structures as having a significant effect on surface regularity. Edges and corners of panels change as the slab curls. Curling is caused by differential shrinkage, because the exposed top surface dries and shrinks more than the bottom. TR34 notes it can occur at any time up to about two years after construction and tends to be unpredictable.

So a survey taken eighteen months after handover measures today's floor, not the floor that was built. If there is ever a dispute over whether a floor met its specification, the survey carried out within that first month, on a recorded grid, is the evidence that counts.

Accuracy and what a report should contain

TR34 notes there are no Standards covering the use of specialist floor survey equipment such as profileographs, and that third-party accreditation, such as UKAS, is available for these survey methods. If a report gives you only a pass or fail, or percentile values without the grid and run locations, it can't be checked and it can't be used to plan remedial work.

If the floor fails

For a free-movement floor, TR34 recommends examining the individual measurements in detail to judge whether the exceedances matter for how the floor will perform. In defined-movement aisles, it may be possible to grind the high areas or, in unusual circumstances, to fill the low ones. Where wheel tracks are ground or filled, the wheels must stay in full contact with the floor so that no transverse thrust or other stresses act on them. Any remedial work will affect the appearance of the floor, and the treated areas should be re-surveyed by the same method.

Working in Germany or elsewhere in the EU

On German projects, floor tolerances are usually specified to DIN 18202, Toleranzen im Hochbau. Its approach is different. Flatness is typically checked by measuring the gap under a straightedge (the Stichmaß) over set distances between measuring points, and its tolerances are limit values for individual measurements, not 95th percentiles over a sampled grid. For warehouses with guided VNA trucks, DIN 15185-1 sets the floor requirements. Results from one system cannot simply be converted into the other. If a specification calls up DIN 18202, EN 15620 or a client's own tolerances, the survey has to be designed around that document from the start.

Further reading

KEY TAKEAWAYS
  • Decide free movement or defined movement first. Specify DM only where the aisle positions are fixed.
  • FM floors are judged on 95th percentile values of Properties E and F (TR34 Table 3.1), plus ±15 mm of datum at every grid point.
  • VNA aisles are judged on dZ, dX, d²Z and d²X over their full length; a single exceedance is a non-compliance.
  • Survey within one month of completion, on a recorded grid, with instruments calibrated to 0.1 mm.
  • A usable report ties every value to the building layout and highlights each exceedance.